Policy explainer
Net-Billing 2026: what NEPRA's new rules mean for your solar payback
On 9 February 2026, NEPRA replaced the old net-metering regime with the new Prosumer (Net-Billing) Regulations (SRO 251(I)/2026). The headline change: excess export buyback fell from PKR 27/unit to ~PKR 10/unit. Self-consumption and hybrid systems now carry the math.
The six things you actually need to know
Effective date
SRO 251(I)/2026, notified 9 February 2026. Applies to all new prosumer applications from that date.
New buyback rate
Excess generation exported to the grid is paid at ~PKR 10/unit (was PKR 27/unit under the old net-metering regime).
Contract length
5 years (renewable). Previously 7 years.
Capacity cap
100% of your sanctioned load. Your system cannot exceed it.
Grandfathering
Applications filed before 9 Feb 2026 are grandfathered at the old higher buyback rates for the remainder of their contract.
Regulator
NEPRA, with certification handled through PPIB. Installer certification still required.
Old net-metering vs. new net-billing
The economics flipped, and your installer should be telling you that hybrid + battery is now usually the better choice.
| Metric | Old (pre-Feb 2026) | New (Net-Billing 2026) |
|---|---|---|
| Buyback rate | PKR 27/unit | ~PKR 10/unit |
| Contract length | 7 years | 5 years |
| Typical payback (residential) | 3 to 5 years | 7 to 12 years |
| System sizing | Up to 1.25× sanctioned load | 100% of sanctioned load |
| Economic story | Sell at high rate, self-consume little | Self-consume + battery for ROI |
| Best system type | On-grid net-metering | Hybrid + battery (bill > PKR 50k) |
How to apply for net-billing in 5 steps
- 1
Confirm DISCO + sanctioned load
Your DISCO bill shows the sanctioned load in kW. The new rules cap your system at 100% of this number.
- 2
Engage a certified installer
Required for net-billing approval. HiTech Energy is certified — installer ref will be provided with your proposal.
- 3
Submit prosumer application to your DISCO
Includes load survey, single-line diagram, plot plan, NTN / CNIC copies, installer certificate, and IRR worksheet.
- 4
DISCO inspection + bi-directional meter installation
Typically 4–8 weeks. DISCO replaces your meter with a bi-directional one; you sign the 5-year prosumer contract.
- 5
System commissioning + first bill cycle
Generation logged on the meter. Excess exports are credited at PKR 10/unit on your subsequent bills.
Per-DISCO net-billing process
Each distribution company has its own forms, timelines and contact desks. Pick yours for a step-by-step checklist.
Net-Billing-ready quote in 30 seconds
Our calculator applies the new PKR 10/unit buyback math and recommends hybrid + battery when it actually makes sense for your bill.